News Flash

Posted on: June 19, 2018

San Pablo Avenue Complete Streets Project - Weekly Updates/Actualizaciones Semanal (06/11/18)

Work Completed This Week

Ghilotti Brothers, Inc. (GBI) continued with median area construction from Rivers Street to Lancaster Drive.  GBI also started work on the east side of San Pablo Avenue north of La Puerta Road.  This work consiste...

Read on...

Public Works - Engineering
Posted on: June 14, 2018

San Pablo Avenue Complete Streets Project - Weekly Updates/Actualizaciones Semanal (06/04/18)

Work Completed this Week

Ghilotti Brothers, Inc. (GBI), the prime contractor for the project, completed placement of asphalt pavement within the former median areas between Lancaster Drive and Robert Miller Drive. GBI also continued construction of the str...

Read on...

Public Works - Engineering
Posted on: May 28, 2018

San Pablo Avenue Complete Streets Project - Weekly Updates (05/28/2018)

Work Completed This Week

The prime contractor, Ghilotti Brothers, Inc. (GBI), completed construction of the street structural section in the areas where median islands were removed along San Pablo Avenue between Lancaster Drive and Robert Miller Drive. Als...

Read on...

Public Works - Engineering
Posted on: May 21, 2018

San Pablo Avenue Complete Streets Project - Weekly Updates/Actualizaciones Semanal (05/21/18)

Work Completed This Week

The prime contractor, Ghilotti Brothers, Inc. (GBI) continued with removal of the median island along San Pablo Avenue north of Robert Miller Drive. GBI also started construction of the street structural section in areas where the ...

Read on...

Public Works - Engineering
Posted on: May 24, 2018

San Pablo Avenue Complete Streets Project - Weekly Updates (05/14/2018)

Work Completed This Week

The prime contractor, Ghilotti Brothers, Inc. (GBI), completed paving work along the westerly portion of San Pablo Avenue in the vicinity of Robert Miller Drive.  This was done to allow relocation of the southbound through...

Read on...

Public Works - Engineering
Posted on: May 10, 2018

San Pablo Avenue Complete Streets Project - Weekly Updates/Actualizaciones Semanal (05/06/18)

Work for this week

Prime contractor, Ghilotti Brothers, Inc. (GBI) continued demolition and excavation of the median area throughout the project limit.  They prepared the subgrade at the south sections of the median from Rivers Street to Lancaster...

Read on...

Additional Info... Public Works - Engineering
Posted on: April 26, 2018

San Pablo Avenue Complete Streets Project - Weekly Updates/Actualizaciones Semanal (4/29/18)

Work for this week

Prime contractor, Ghilotti Brothers, Inc. (GBI) started demolition of the median area throughout the project limit. 

Mike Brown Electric (MBE) started work on installing temporary traffic signals at Robert Miller Drive intersecti...

Read on...

Additional Info... Public Works - Engineering
Posted on: April 26, 2018

San Pablo Avenue Complete Streets Project - Weekly Updates/Actualizaciones Semanal (4/22/18)

Work for this week

Prime contractor, Ghilotti Brothers, Inc. (GBI) started sawcutting the median area for preparation of demolition. They also did potholing for existing utilities in the median area for the entire length of the project. 

Work forec...

Read on...